Zip Line in Permet, Albania
Architect
Year
2026
Location
Permet, Albania
Size
S
Time
2 weeks
Visuals created
3
For the Zip Line project in Permët, we didn’t just deliver images; we accelerated the entire design process. We proved that high-end architectural intent doesn’t have to be slow.
The 48-Hour Sprint: Decision-Making at Scale
Within the first 48 hours, we delivered 10 distinct sketches and visual concepts.
-
The Goal: To give Cityförster a menu of emotional directions.
-
The Result: We worked alongside the architects to identify which narrative explained the soul of the project best.
High-Velocity Execution
Once the direction was locked, we moved into high gear. In just 10 days, the final commissioned imagery was ready for delivery.
-
Phase 1: 48h for 10 Conceptual Sketches (Included in the service).
-
Phase 2: 1.5 weeks for High-End Production.
-
The “Bigshots” Edge: Conceptualizing isn’t an extra; it’s our core. We integrate the “thinking” phase into our price. Best images are born from shared strategy, not just rendering hours.
The Bottom Line
10 Concepts. 1.5 Weeks. This is how we work alongside Cityförster: acting as an extension of their team to ensure their architectural vision hits the market with maximum impact, minimum lag.


